Jun. 17th, 2017

osodecanela: (Default)
Stressful day here.

I was out early to hit the hardware store. I got the wrong supply hose for the toilet when I went yesterday, and she nice David will be away all next week, and I want this bathroom to use, I ran. LJ needed stuff doe an electrical project and the first hardware store was out of them, so I hit the other one in Clearlake which had them and also put me right across the street from Grocery Outlet. I had both dish soap and laundry detergent on my shopping list, so I knocked Walmart off my stops-to-make list & went there instead. Got the detergent, picked up LJ's favorite yogurt, some fresh white peaches and coffee, but struck out with the soap dish, cafe curtains and toothbrush holder. They're on the list for mañana at Home Depot. I had to get home to meet the cable guy.

We're now getting internet services from Mediacom who are the only game in town the county for fast internet and cable tv (as opposed to satellite). After ordering service for cable tv over a week ago this was the first appointment available for cable installation.

I have two HD tv's big screens each, both having originally come outta office waiting room. I got the better one of the two up in the master bedroom last week. We only agreed on placement of the screen upstairs the night before, incidentally in the location I had originally envisioned. There hadn't been time to get the tv up on the wall.

Fading suddenly. I'll continue this in the morning.
osodecanela: (Default)
This was David's first experience using epoxy grout, and sadly he wasn't able to get everything grouted before the grout set up. There is a small section of the floor unfortunately right in front of the door which still needs grouting & we don't have enough of the gray grout left. Further, the finish plumbing (faucet and shower head) still remain to be put in. I still need to settle on a custom shower door, which unfortunately is going to be pricey, so likely we'll be living with a shower curtain ,hung from a tension rod for the next several months, while I search for a permanent alternative.

What remains to be done in the bathroom is a curtain for the window (which I am likely to make rather than buy), a toilet paper holder, door knobs for the door, hanging said door, and deciding on a bathmat. Otherwise, the bathroom is done (& the check is in the mail).





Profile

osodecanela: (Default)
osodecanela

September 2017

S M T W T F S
     12
3 456789
10111213141516
1718192021 2223
24252627282930

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 22nd, 2017 01:30 pm
Powered by Dreamwidth Studios